Amstelwood.
Sustainable
eye – catcher of
Amstelveen

Welcome to Amstelwood, Amstelveen’s first wooden residential tower. Thanks to a diverse mix of high – quality, sustainable residences, this green calling card will ensure that people and nature thrive. With its firm foothold on the ground, view of the trees and its head in the clouds, Amstelwood will grab your attention and celebrate the beauty of nature. The seasons will be easily recognisable in the nature here thanks to all the greenery.

Discover the perfect balance between nature and urban life, sustainable living and high levels of comfort.

Urban convenience

in natural surroundings

A home that
moves with you

Amstelwood sets a new standard in healthy building and comfortable living. The hybrid – timber construction houses 131 high – quality and energy – efficient apart ments with a spacious outdoor area and views of the surrounding greenery. 72 of the apartments are owner – occupied homes, ranging from a one – bedroom, 45 m2 apartment to a spacious penthouse of 135 m2 with a terrace facing two sides: all the homes are bathed in light and have an interior storage room, underfloor heating and connection to a heat and cold storage system (WKO). The project building works are scheduled to start in the autumn of 2024, and with a construction time of around two years, the target completion date is in the autumn of 2026. Sales start in 2024!

A home that
moves with you

Amstelwood sets a new standard in healthy building and comfortable living. The hybrid – timber construction houses 131 high – quality and energy – efficient apart ments with a spacious outdoor area and views of the surrounding greenery. 72 van de appartementen zijn koopwoningen, van een 2-kamerappartement van 45 m² tot riant penthouse van 135 m² met een tweezijdig georiënteerd terras: alle woningen baden in het licht en beschikken over een inpandige berging, vloerverwarming en aansluiting op een WKO (warmte-koude-opslaginstallatie).

The project building works are scheduled to start in the autumn of 2024, and with a construction time of around two years, the target completion date is in the autumn of 2026. Sale starts in mid-2024

"We wanted to create a very sustainable tower using wood as the building material as it fits in so well with the lush foliage in Amstelveen."

-Do Janne Vermeulen - Team V

Building with wood,

room for green

Do you see yourself
living at
Amstelwood?

Register now to get all the latest news!